Fast activity search
Find work by description, CSI division, family, material, size, thickness, fixing method or activity code.
AEn Productivity EngineSearch a controlled database of 30,645+ construction activities, apply project conditions, and generate practical productivity, production/day and labor-cost outputs through AEn's protected calculation engine.
Keep intrinsic activity characteristics in the Base MH and project conditions in separate adjustment factors.
Find work by description, CSI division, family, material, size, thickness, fixing method or activity code.
Capture practical site conditions through a controlled, easy-to-use input workflow.
Receive consistent productivity outputs while AEn keeps its proprietary calculation methodology protected.
Convert productivity into practical daily output for planning and estimating decisions.
Generate a labor-cost output directly from the protected productivity calculation.
Use a revision-controlled construction productivity database maintained by AEn.
Select the exact construction activity and intrinsic variant.
Choose the applicable project and trade factors.
AEn processes the selected inputs through its protected calculation engine.
Review productivity, production/day and labor-cost outputs for your project.
The database continues to expand through controlled revisions and source-led gap analysis.
Concrete, reinforcement, formwork, precast, repair, strengthening, steel and timber.
Masonry, roofing, waterproofing, doors, glazing, stone, marble, granite, wood, ceilings, floors and coatings.
Fire protection, plumbing, HVAC, BMS, electrical, ICT/AV, fire alarm and security.
Earthworks, shoring, dewatering, paving, irrigation, utilities, roads, rail and marine.
Healthcare, secure communications, special doors, cleanrooms, conveying and specialty equipment.
Process piping, material handling, treatment systems, industrial equipment and renewable power.
Man-hours required to complete one measured unit of an activity. AEn calculates the project-specific result through its protected internal methodology.
No. It provides a consistent productivity reference to support professional estimating and project review.
You can calculate 15 unique activities free. Recalculating the same activity does not consume another unique-activity allowance.
No. AEn uses discipline-appropriate internal logic for different construction work groups.
Yes. AEn is revision-controlled and is designed to add new activities, variants and specialist systems over time.
No payment is required to create the trial account.